Case study: our first production batch, four containers from port to proof

Four containers for a global shipping line: two truckloads weighed in, cut within days, and one document mismatch that we caught before any certificate was issued.

Published Updated 4 min readLATAM Recycling Group
4

end-of-life containers in the batch

9.06 t

material weighed in at the recycling yard

≈11 t

CO₂ avoided, indicative estimate

Real photos from our recycling yard in Panamá, November 2026. Container numbers and markings are blurred to protect our clients.

In November 2026 we ran our first production batch in Panamá: four end-of-life shipping containers belonging to a global shipping line. It was small on purpose. The goal was to run the full process for real, from release to recycled, and to prove that every step could be documented and checked.

The brief

The client needed four retired containers taken out of circulation in Panamá, with evidence that each unit had been destroyed and had not entered local use. Every container had to be traceable by its container number from pickup to the final cut, with photo evidence of the first cut, which is also what our partner in the Netherlands requires.

What we did

  1. Release and work orders. Each container was registered in Certainer with its own work order.
  2. Pickup. The containers were collected and delivered to the recycling yard in two truckloads.
  3. Weighing. On 6 November 2026 both loads were weighed in at the yard, with net weights of 4,520 kg and 4,540 kg: 9,060 kg in total.
  4. Cutting and processing. The containers were cut and processed on 9 November 2026, three days after weigh-in. The cutting was photographed, with container numbers legible on the cut panels.
  5. Documentation. The recycler issued its destruction certificate for the batch, and all evidence was attached to each container's record.

The check that mattered

When we cross-checked the recycler's destruction certificate against our photos, one container number did not match. The certificate listed a unit that appeared in none of the photos, while the photos clearly showed a different unit that was missing from the certificate.

Three containers matched on every document and every photo. For the fourth, we did not guess and we did not issue anything. We held that container's paperwork until the recycler reissued a corrected destruction certificate listing the right unit. Only then was the batch complete.

It is a small detail, and exactly the kind that matters. A certificate of recycling is only worth something if every number on it can be traced back to evidence. Catching a mismatch before a certificate exists is the system working as intended.

The result

  • All four containers are on record with matching photos, weights and recycler paperwork.
  • The batch was registered as our first production run in Certainer on 23 November 2026, on a clean system with all pilot data removed.
  • Certificates are issued per container, each with its own number and QR code for public verification.

The impact, in numbers

The yard weighed in 9.06 tonnes of material. Assuming, conservatively, that around 80% of that is recoverable steel, and applying worldsteel's figures for every tonne of steel scrap used in steelmaking, the batch avoids roughly 11 tonnes of CO₂ and saves about 10 tonnes of iron ore compared with making the same steel from ore. These are indicative estimates, not a certified carbon claim.

What we learned

Weights, dates and document details in this case study come from our own batch records: weigh-in tickets, the recycler's destruction certificate and photo evidence.

The process works end to end, and the controls work too. The next batches will follow the same flow at larger volumes, with the same rule: no certificate until every number matches the evidence.

Sources

  1. worldsteel: about 1.5 t CO2 avoided per tonne of steel scrap used
  2. worldsteel LCA methodology: 1.4 kg iron ore saved per kg of scrap

How many containers do you need to retire?

Tell us the volume and the location. We reply with a plan and a price.

Request a quote